photo

Lewis Waswa


Last seen: 20일 전 2021년부터 활동

Followers: 0   Following: 0

통계학

  • Thankful Level 3

배지 보기

Feeds

보기 기준

질문


Setting up an optimization in matlab
Hi everyone. I have an optimization problem that seeks to aid the selection of suitable conductors in a network planning exerci...

3개월 전 | 답변 수: 1 | 0

1

답변

질문


iterating a function within itself
Hey everyone. I have a function which performs adjustment based on 2 indices NPI and CPI as shown below. [A,B,C,D,NPI,CPI]=Adj...

11개월 전 | 답변 수: 2 | 0

2

답변

질문


Calling a function in itself.
I have a long code that uses two indices to update the resistance values in a powerflow program as below. The powerflow program ...

11개월 전 | 답변 수: 1 | 0

1

답변

질문


Editing a graph.
I have a graph with about 115 nodes, all differently interconnected. I would like to do two things: Plot the directed graph il...

대략 1년 전 | 답변 수: 1 | 0

1

답변

질문


Plotting a figure from a matrix
I have the following matrix, which describe the connection between nodes on a network. How can I plot this in Matlab? A=[1 2; 2...

대략 1년 전 | 답변 수: 2 | 0

2

답변

질문


Calculating the new beta parameters given two variables
I have two beta distributed random variables with parameters, mu1, alpha1 and beta1 and mu2, alpha2, beta2 for variables A and ...

1년 초과 전 | 답변 수: 1 | 0

1

답변

질문


Implementing parallel while loops in matlab.
Hi all, I am writing code that has two while loops in a random sampling exercise. I have two questions. I would like the whil...

1년 초과 전 | 답변 수: 0 | 0

0

답변

질문


Fillmissing function with movmean
I have a set of data with NaNs. So I filled the NaNs useing the fillmissing function. However, while the final array does not ha...

대략 2년 전 | 답변 수: 1 | 0

1

답변

질문


Time subscripting, selection of weekdays and weekends from a timetable
Hi guys. I have had this problem for a while now. I have a timetable consisting of timeseries yearly data resolved at 30 minute...

2년 초과 전 | 답변 수: 1 | 0

1

답변

질문


Creating a datetime variable - unconventionally
I have an excel sheet which has several columns including a date column of which I would like to create a datetime object from....

2년 초과 전 | 답변 수: 3 | 0

3

답변

질문


Selecting Mondays from a Timetable or Table using the datetime object
Hi, I would like to write a script that scrolls through my five minutes resolved timetable / table to select identifies all the...

2년 초과 전 | 답변 수: 1 | 0

1

답변

질문


Reshaping a 2D Timetable to a 3 D timetable
Hi everyone I have five minutes resolution timetable with 20 entries which makes the whole TT to be of the dimensions 17596 by...

2년 초과 전 | 답변 수: 1 | 0

1

답변

질문


How to specify a stop criterion in an if loop.
I have two files named TData (j) (technical Data) and RData (i) in an array format. I also have a file NFile (i), which is suppo...

대략 3년 전 | 답변 수: 1 | 0

1

답변

질문


While loop and comparisons
Hi guys, I have 2 files - file 1 (length n) is a list of conductor resistances from which I am supposed to pick an optimal re...

대략 3년 전 | 답변 수: 0 | 0

0

답변

질문


Getting a number of different outputs using a single function
Hi everyone. I have created a function that can iteratively generate more sets of data from a smaller set of data through a ra...

3년 초과 전 | 답변 수: 1 | 0

1

답변