inqury with the lsim command

조회 수: 8 (최근 30일)
David Zhang
David Zhang 2013년 10월 4일
댓글: David Zhang 2013년 10월 4일
I am doing the time-history analysis of structure under earthquake motions. The time step of the recorded motion is 0.001. When I use lsim function to conduct the direct integration, and it is noted with the following warning. ---- Warning: The input signal is undersampled. Use a sampling period smaller than 0.00049. > In warning at 26 In ssdata.lsim>LocalCheckSampling at 142 In ssdata.lsim at 43 In lti.lsim at 102 In msup at 92 ----
so how i can solve this problem? reduce the time step? which i believe is not a good option.
  댓글 수: 1
David Zhang
David Zhang 2013년 10월 4일
any suggestions on this warning?

댓글을 달려면 로그인하십시오.

답변 (0개)

카테고리

Help CenterFile Exchange에서 Earthquake Engineering에 대해 자세히 알아보기

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by