I have a system which is quite a bit complicated and is a dynamical system with Stiff requirements. There is a particular gain value which controls the settling time substantially in the final output. I want to plot all the outputs from the resulting variations of that gain. How can I achieve this?
More importantly, that gain causes a waterbed effect(tradeoff between settling time and overshoot) how can I optimise to get the gain value which gives a early settle as well as a robust model. Note the minimum value of the gain is 3.

댓글 수: 1

Please note the maximum acceptable value of the gain is 50, sampled at a difference of 5.

댓글을 달려면 로그인하십시오.

답변 (0개)

카테고리

도움말 센터 및 File Exchange에서 Linearization에 대해 자세히 알아보기

제품

릴리스

R2021a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by