How to do vector calc for cost allocation

조회 수: 1 (최근 30일)
Pete sherer
Pete sherer 2020년 7월 31일
편집: dpb 2020년 7월 31일
The problem seems simple to do it using for loop, but I wonder if there's an efficient way to do below calculation.
costPerTotalUnit
0-1: 100%
1-2: 50%
2-3: 10%
3-10: 0%
unit/ cumsum/ cost
0.5/ 0.5/ 0.5*100%
0.3/ 0.8/ 0.3*100%
0.9/ 1.7/ 0.2*100% + 0.7* 50%
0.2/ 1.9/ 0.2*50%
0.5/ 2.4/ 0.1*50% + 0.4*10%
To do total calculation, it can be done quickly per below.
cumsumTotalUnit = 2.4;
costPercent = max(min(cumsumTotalUnit-(0:10-1),1),0);
costRate = [1 .5 .1 zeros(1,7)];
totalCost= costPercent.* costRate
(= 1.54)
However I want to be able to obtain the cost for each unit purchase. Maybe somekind of backward allocation?
Thanks,
PT

답변 (0개)

카테고리

Help CenterFile Exchange에서 Historical Contests에 대해 자세히 알아보기

태그

제품


릴리스

R2020a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by