Simulink test multiple sequences for harness
이전 댓글 표시
Does a test harness in simulink test have a one to one relationship to a test sequence? Or can I add multiple test sequences to a harness?
If not I don't see the point of a test sequence harness.
답변 (1개)
Paul Urban
2020년 2월 26일
0 개 추천
Yes it is possible to put multiple test sequences inot a test harness. You can use variants to control which Test Sequence is active during a specific test.
댓글 수: 2
Michael Sarcevic
2020년 2월 27일
Paul Urban
2020년 3월 2일
Unfortunately there isn't an example of test sequences with variants but there is doc on using Variants that could be applied to a Test Sequence. https://www.mathworks.com/help/simulink/slref/variant-subsystems.html
It also is possible to have more than one test sequence within a single test sequence block in a test harness byt using the when-decomposition pattern. In the Test Sequence editor:
- create a parameter, e.g., ScenarioId,
- create one top-level step and use the context menu to enable when-decomposition,
- create two or more child steps underneath with the following content:
- Scenario1 when ScenarioId == 1
% MATLAB code for scenario 1
- Scenario2 when ScenarioId == 2
% MATLAB code for scenario 2
- …
- UnknownScenario
assert(false, 'unknown scenario %d', ScenarioId)
- in the base or model workspace, create a variable named ScenarioId with the scenario number that you’d like to run.
See https://www.mathworks.com/help/sltest/ug/introduction-to-test-sequences.htmlfor more details about when-decomposition.
카테고리
도움말 센터 및 File Exchange에서 Inputs에 대해 자세히 알아보기
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!