HDL Coder: Matlab stops working at code generation when generating high-level timing critical path report (Matlab 2015b)

Hello, I try to generate HDL code of a quite complex model for my Zynq. The code generation itself works and I can generate the bitstream for my target. Now I am interested in the “high-level timing critical path report” to compare the design with another. But when I check the checkbox “generate high-level timing critical path report” Matlab stops working at code generation after a while. (Windows error massage popup and force me to close Matlab). What could be the source for this problem?
Regards, Stephan

답변 (1개)

You can check if this issue is already resolved.
Reproduction steps are highly appreciated for actionable next steps.

카테고리

도움말 센터 및 File Exchange에서 Code Generation에 대해 자세히 알아보기

제품

질문:

2017년 11월 13일

답변:

2021년 6월 22일

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by