Hello,
I have a problem with the attached Simulink Scheme. The generator has been put as a Swing bus, while the load as a PQ bus I have tried to run a load flow simulation on the scheme, but it seems I have no convergence.
What I have noticed is that: -By removing the PI section line, while maintaining all the rest, the load flow actually converges to a solution. Of course, same goes if remove both PI section line and the transformer. -By reducing the load (up to 14MW and up to 14Mvar) the system still converges, even if I keep the PI section line. -By replacing the load (a R-L parallel load) with an R-L series load (of equal P and Q) the system still converges.
Could you please help me figuring out what the problem is? Thanks in advance, Davide

댓글 수: 2

Franklin Ngo
Franklin Ngo 2019년 5월 19일
Hello,
I checked your system. Your problem is about transient stability. The maximum power: Pmax = E'*Eb/X ( for more details, please read the chapter 13. transient stability. - 13.1 an elementary view of transient stability - book: [prabha kundur] power system stability and control). Your power is too large, then your impedance have to be reduced. Please check the attached file.
Kamilu Sanusi
Kamilu Sanusi 2023년 3월 9일
@Franklin Ngoplease I am similar problem, on IEEE 9 bus system, if i set my load as constant impedance load, the active power injected at the generator bus becomes greater than the specified mechnical power input. The active and reactive power PL & QL of the load also rises.
Please what is the likely problem, all other loads are okay
Thank you

댓글을 달려면 로그인하십시오.

답변 (1개)

Willim
Willim 2018년 11월 29일

0 개 추천

Thank you for sharing the problem. I would like to contact you if you would like to help each other in this problem.

카테고리

도움말 센터File Exchange에서 Power and Energy Systems에 대해 자세히 알아보기

질문:

2017년 5월 21일

댓글:

2023년 3월 9일

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by