How to calculate average and maximum waiting time for appliances scheduling in smart grid ,in matlab need coding help?

조회 수: 1 (최근 30일)
How to calculate average and maximum waiting time for appliances scheduling in smart grid, in matlab need coding help?
i have 12 appliances which are given in my previous question ?
I have the following appliances: lights, clothes dryer, dish washer, washing machine, oven, iron, refrigerator, lightening, vacuum cleaner, poop pump, EWH (electric water heater), hair dryer, AC (air conditioning)
  댓글 수: 2
Walter Roberson
Walter Roberson 2015년 12월 9일
I would point out that you have not given any reason that they could not all be run when-ever they are needed.
Zafar Iqbal
Zafar Iqbal 2015년 12월 10일
Walter Roberson the appliances will be run by scheduler as scheduled for different time slots out of 24 hours e.g washing machine will run from 11 am to 1 pm only two hours and iron will run at 6 am morning for 1 hour and at evening at 3 pm for 1 hour similar for other appliances but that is defined in scheduler and it will be done by scheduler automatically and not by consumer ,all the appliances will run but in different time slots in 24 hours time horizon ,time slot is denoted by t and time horizon is denoted by T.John D'Errico please open the question.

답변 (0개)