how to run a simulation at different times

I would like to run my model, lets say 3 days at 40C temperature and 4days at 60C and so on.
As per my understanding and trail, i have used a if block and merge the signals, is it right?
how can i change that time and input value to simulate? iw ould like to see how it's changing with time and temperature.
have a look at the attachments for better view, any views and guidance?

답변 (1개)

Benjamin Thompson
Benjamin Thompson 2022년 10월 10일

0 개 추천

You can use the Signal Builder block to configure how you want a signal to change over time. I assume you are simulating the model one time for seven days total.

카테고리

도움말 센터File Exchange에서 Simulink에 대해 자세히 알아보기

질문:

2022년 10월 10일

답변:

2022년 10월 10일

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by