how to run a simulation at different times
조회 수: 1 (최근 30일)
이전 댓글 표시
I would like to run my model, lets say 3 days at 40C temperature and 4days at 60C and so on.
As per my understanding and trail, i have used a if block and merge the signals, is it right?
how can i change that time and input value to simulate? iw ould like to see how it's changing with time and temperature.
have a look at the attachments for better view, any views and guidance?
댓글 수: 0
답변 (1개)
Benjamin Thompson
2022년 10월 10일
You can use the Signal Builder block to configure how you want a signal to change over time. I assume you are simulating the model one time for seven days total.
댓글 수: 0
참고 항목
카테고리
Help Center 및 File Exchange에서 Sources에 대해 자세히 알아보기
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!