fft question about data length and spline data

I want use fft analizy my water level data.
because my data have lost ,so i use spline fill up my data.
but when i use data length exceed 8760 hr (365) day my spline line result not would be normal.
the attached file are the spline results of the test data length of one year and two years.

답변 (1개)

Star Strider
Star Strider 2022년 4월 25일

0 개 추천

If you have R2016b or later, the fillmissing function will likely be a better choice.

댓글 수: 2

if my data have very large loss in a specific area
which way should i use fillmissing to missing values
attcached file is my raw-data and fillmissing result (spline)
I would not use the 'spline' nethod with fillmissing where there is a large gap. I would instead use 'linear' or some other choice that provides a reasonable approximation of the missing data. Another option is the Signal Processing Toolbox resample function.

댓글을 달려면 로그인하십시오.

카테고리

도움말 센터File Exchange에서 Splines에 대해 자세히 알아보기

질문:

2022년 4월 25일

댓글:

2022년 4월 26일

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by