Question about finding the optimal value _Problem based optimization

조회 수: 2 (최근 30일)
NN
NN 2021년 9월 20일
I have tried to plot the values of optimal solution (minimal cost in this problem)
When I used the command
options = optimoptions(prob.optimoptions,'Display','iter');
I am getting a big value of 8.97e10 $/hr as Fval(optimal solution).
Please check this and confirm if it is correct or not or since the problem using an optimized time vector(dt=300), Is it required to modify the fval we get at the end (8.97e10 $/hr.)?
Please let me know. I am attaching the modified files(battsolaropt) and the diagnostic viewer screen for your reference. It is written No feasible solution was found.
Also please let me know why a gain of (3600*100) is used for calculating cost in Simulink, Why 100 is there?
Kindly advice.

답변 (0개)

카테고리

Help CenterFile Exchange에서 Problem-Based Optimization Setup에 대해 자세히 알아보기

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by