Loop that I am trying to get rid off

조회 수: 1 (최근 30일)
joseph Frank
joseph Frank 2011년 8월 6일
To follow up on my previous thread regarding a very time consuming routine, the main source of slowness I believe is the following: Rating agencies such as Moody and Standard and Poors report ratings for bonds outstanding. This rating changes from time to time. So I have in a matrix X0: column 1 is a bond ID Column 2 is the rating beginning date Column 3 is the rating Column 4 is the rating ending date for example for Bond ID 1 I have the following inputs: Ratings=[1 726834 3 728000;1 728000 2 729500;1 729500 3 731000]; then I have a vector date of 20 year daily data so I am running a loop that looks like this for a single bond (I have 15000 bonds):
for i=1:length(date)
x1=find(X0(:,2)<=date(i) & X0(:,4)>date(i));
if isempty(x1)
R(i)=nan;%Rating
else R(i)=X0(x1,3);
end
end
Is there a way to get rid of this loop ?

채택된 답변

Oleg Komarov
Oleg Komarov 2011년 8월 6일
% Preallocate R already with NaNs
R = NaN(size(date));
% Now we want to test how many dates belong to each rating period, to do this construct the edges of each period
edges = unique(X0(:,[2,4]));
% Total length or rating history (excluded last day of last period)
idx = date >= edges(1) & date < edges(end);
% Count ho many dates fall per period (last bucket is last day of last rating period, which is excluded)
len = histc(date, edges);
% Use run-length decoding (vectirized)
R(idx) = rude(len(1:end-1), X0(:,3));
Rude on FEX: here
  댓글 수: 3
Oleg Komarov
Oleg Komarov 2011년 8월 6일
Look at X0:
12739 728951 8 728951
joseph Frank
joseph Frank 2011년 8월 6일
thanks. I eliminated the duplication

댓글을 달려면 로그인하십시오.

추가 답변 (2개)

Fangjun Jiang
Fangjun Jiang 2011년 8월 6일
I wonder if you can use interp1(). Basically, it is a look up operation, right? It will fill NaNs for dates outside of Ratings. But there should be no gap of dates in Ratings.
Use your own discretion. BTW, don't use 'date' as the variable name. It's a function.
Ratings=[1 726834 3 728000;1 728000 2 729500;1 729500 3 731000];
X=[Ratings(:,2),Ratings(:,4)-1]';
X=X(:);
Y=[Ratings(:,3),Ratings(:,3)]';
Y=Y(:);
Dates=726830:731005;
R=interp1(X,Y,Dates,'nearest');
  댓글 수: 1
Oleg Komarov
Oleg Komarov 2011년 8월 6일
I like your approach, more comprehensible.

댓글을 달려면 로그인하십시오.


Daniel Shub
Daniel Shub 2011년 8월 6일
Loops in MATLAB are much faster nowadays then they used to be. Without timing solutions, it is not always obvious what way is fastest. Sometimes you just want to get to fast enough.
It looks to me like you could loop over the rows of X0 instead of the dates.

카테고리

Help CenterFile Exchange에서 Dates and Time에 대해 자세히 알아보기

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by