Terribly slow simulation // NN Predictive Controler.
조회 수: 7 (최근 30일)
이전 댓글 표시
Hello.
I happen to have some problems with simulations of systems with NN Predictive Controler.
At first, I thought the XY Graph was a problem, but I removed it so I could write the data directly to the workspace from simulations using both NARMA-L2 controler and Predictive controler, and now simulations with NARMA-L2 are done instantly, while the ones with Predictive controler take more than 1 hour (!) for simulation time 50. What is wrong?
Looking forward to any help from you guys.
댓글 수: 0
답변 (0개)
참고 항목
카테고리
Help Center 및 File Exchange에서 Model Predictive Control Toolbox에 대해 자세히 알아보기
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!