AC Microgrid Performance when the main grid is faulted
버전 1.0.0.0 (71.9 KB) 작성자:
Venkatesh Yadav
AC Microgrid Performance when the main grid is faulted
credits to ankith reddy. AC microgrid operates at 480v. AC input from the 120 kv main grid is stepped down to 11 kv and then stepped down to 480v. Fault occurs at t=10 sec. AC microgrid is separated from the main grid through a breaker