Unit commitment by dynamic programming method

버전 1.0.0.0 (14.1 KB) 작성자: Vladimir Stanojevic
unit commitment (plant scheduling) based on the forward DP method
다운로드 수: 8.8K
업데이트 날짜: 2011/7/5

라이선스 보기

Unit commitment based on an advanced forward DP technique. The user can choose to keep track of more than one predecessor (or even all) thus overcoming the drawback of DP method that it cannot "see" the optimal solution in some cases.
Program constraints are min. and max. power output of generators, their min. up and down times, ramp rates, required reserve. Start-up costs can be constant (cold), hot/cold or exponential. Production cost function can be either linear or quadratic. The results can be printed in summarized or in detailed form. Program works in time resolution of 1 hour.

인용 양식

Vladimir Stanojevic (2026). Unit commitment by dynamic programming method (https://kr.mathworks.com/matlabcentral/fileexchange/32073-unit-commitment-by-dynamic-programming-method), MATLAB Central File Exchange. 검색 날짜: .

MATLAB 릴리스 호환 정보
개발 환경: R2008a
모든 릴리스와 호환
플랫폼 호환성
Windows macOS Linux
카테고리
Help CenterMATLAB Answers에서 Quadratic Programming and Cone Programming에 대해 자세히 알아보기
버전 게시됨 릴리스 정보
1.0.0.0