Unit commitment by dynamic programming method

unit commitment (plant scheduling) based on the forward DP method

이 제출물을 팔로우합니다

Unit commitment based on an advanced forward DP technique. The user can choose to keep track of more than one predecessor (or even all) thus overcoming the drawback of DP method that it cannot "see" the optimal solution in some cases.
Program constraints are min. and max. power output of generators, their min. up and down times, ramp rates, required reserve. Start-up costs can be constant (cold), hot/cold or exponential. Production cost function can be either linear or quadratic. The results can be printed in summarized or in detailed form. Program works in time resolution of 1 hour.

인용 양식

Vladimir Stanojevic (2026). Unit commitment by dynamic programming method (https://kr.mathworks.com/matlabcentral/fileexchange/32073-unit-commitment-by-dynamic-programming-method), MATLAB Central File Exchange. 검색 날짜: .

카테고리

Help CenterMATLAB Answers에서 Quadratic Programming and Cone Programming에 대해 자세히 알아보기

일반 정보

MATLAB 릴리스 호환 정보

  • 모든 릴리스와 호환

플랫폼 호환성

  • Windows
  • macOS
  • Linux
버전 퍼블리시됨 릴리스 정보 Action
1.0.0.0