이 제출물을 팔로우합니다
- 팔로우하는 게시물 피드에서 업데이트를 확인할 수 있습니다
- 정보 수신 기본 설정에 따라 이메일을 받을 수 있습니다
Real Examples
- China (2021): A 10-story residential building was assembled in 28 hours using modular prefabrication.
- Dubai: Prefab techniques have been tested for towers to cut construction time by 50–70%.
- 3D-printed homes: Already a reality for single-story houses in a single day.
Tested on standard test functions.fine tune for better results.
인용 양식
praveen kumar (2026). Click-Lock Optimization (CLO) algorithm (https://kr.mathworks.com/matlabcentral/fileexchange/182392-click-lock-optimization-clo-algorithm), MATLAB Central File Exchange. 검색 날짜: .
| 버전 | 퍼블리시됨 | 릴리스 정보 | Action |
|---|---|---|---|
| 1.0.0 |
