How to integrate an acceleration/time curve?
조회 수: 3 (최근 30일)
이전 댓글 표시
Hello, I have the following, x=time, y=acceleration.
![](https://www.mathworks.com/matlabcentral/answers/uploaded_files/165553/image.png)
I want to integrate it twice so I can get x=time, y=position. I've tried to use ccumtrapz and the trapezoidal method but It doens't seem to apply to my curve. Any help?
The curve was obtained with the data given by two rows from excell.
댓글 수: 0
답변 (2개)
Jan
2017년 6월 26일
cumtrapz is the solution and it applies to all inputs. The problem is, that your data look noisy. It looks like 3 sine waves recorded with a low frequency. Intergrating amplifies the noise.
The value of the acceleration is changing rapidly compared to the sampling frequency. You can epect that the velocity and position look very rapid also. Please explain what "it doens't seem to apply to my curve" mean, because perhaps just a yout expectations are the problem.
댓글 수: 2
Jan
2017년 6월 26일
편집: Jan
2017년 6월 26일
The ploted diagram is exactly what is defined by the code. So please explain, why you consider it as "nonsense". What do you expect? The high fluctuation in the acceleration creates some stair effects. The average acceleration is below zero and the velocity is decreasing. The onlöy confusing detail is that the X axes have different lengths although both are "tempo1".
PS. Start code with two spaces or use the "{} Code" button.
Wembley
2017년 10월 16일
Did this question get resolved? Surely the velocity graph should be "moving" up & down with the Acc graph.
댓글 수: 1
Jan
2017년 10월 17일
@Paul: No, it doesn't. Most of the acceleration is negative and you observe the expected reduction of the speed. The short positive parts can be identified as small stair in the output, but they are too short to increase the velocity.
cumtrapz is in fact the correct method and only the expectation of the user was incorrect.