- whether the calculations can be carried out quickly enough to sustain the desired control rate. This might require using faster hardware, or using Simulink Real-Time, or (common) using approximations
- latency: in some cases, calculations can be handled at the appropriate rate, but the delay before the answer might be too much. There are a number of different causes for delay, including signal delays... but also including the fact that every extra derivative in the calculation requires more signal processing time
- whether your equipment is able to get enough data into the right place in the necessary time. USB based DAQ can run into this more than Ethernet or DAQ cards present in the host.
Real-Time Controller with DAQ
조회 수: 3 (최근 30일)
이전 댓글 표시
Hallo everyone,
I have a general question for automatisation engineers. Is it possible to design a real-time controller for a hardware with daq-device? the Parameter im trying to control is the displacement measuerd by an accelerometer.
If you have any information please let me know.
Regards
Ali
댓글 수: 0
채택된 답변
Walter Roberson
2022년 7월 4일
Within limitations, yes. I have not done this myself, but I have seen people mention having done it.
There are at least three fundamental issues that need to be considered:
댓글 수: 0
추가 답변 (0개)
참고 항목
카테고리
Help Center 및 File Exchange에서 Data Acquisition Toolbox Supported Hardware에 대해 자세히 알아보기
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!