The code simulates a wireless ad-hoc network, considering the effects of transmission delay, queueing delay, and propagation delay on packet transmission between nodes. The code sets parameters for the simulation, creates random node positions within an area, and calculates distance, adjacency, and delay matrices. It then simulates packet transmission between nodes, computes delays, and visualizes the network and delays between nodes on a graph.
인용 양식
Ardavan Rahimian (2026). Wireless Ad-hoc Network Delay Analysis and Visualization (https://kr.mathworks.com/matlabcentral/fileexchange/128854-wireless-ad-hoc-network-delay-analysis-and-visualization), MATLAB Central File Exchange. 검색 날짜: .
MATLAB 릴리스 호환 정보
개발 환경:
R2023a
모든 릴리스와 호환
플랫폼 호환성
Windows macOS Linux태그
| 버전 | 게시됨 | 릴리스 정보 | |
|---|---|---|---|
| 1.0 |
