possible reasons for increasing time of batch

Hi all!
I send jobs to a remote cluster machine and do a tic-toc around my batch command. Unfortunately the measured time increases a lot during a loop over 300 of similar jobs... Staring from 20s in the beginning I come to 200s already for job number 75...
Any ideas what could be the reason for that???
Thanks very much!
Rafael

댓글 수: 1

Rafael
Rafael 2013년 9월 12일
편집: Rafael 2013년 9월 12일
By the way, I tried to restart my local matlab and go on with the loop:
I again find times around 20s, so something happens on my local machine which slows me down...
No, it does not have the same effect if I "clear all". Then increasing starts at same already increased amount of time...

댓글을 달려면 로그인하십시오.

답변 (2개)

Image Analyst
Image Analyst 2013년 9월 12일

0 개 추천

It might depend on what you're doing. Are you doing anything with axes? I once noticed that when I was in an intensive loop repeatedly displaying new images in the same axes, it would get slower and slower until it was crawling along. Then I put in a "cla reset" just before I showed an image and after that it was uniformly speedy. Could that help you?
Rafael
Rafael 2013년 9월 17일

0 개 추천

Hi all. Thanks for the suggestion with these axes, but thats not relevant here I think.
I "simply" submit a function with a few basic parameters (no big data, only paths where to load the data from on the cluster) and a new CurrentDirectory via batch. The function then loads, processes and stores data on the clusters harddrives, so I dont keep the connection to the jobs.
Only thing what really bothers me is the incrasing amount of time my loop needs per job-submission.
(Cluster uses torque as jobmanager)
As a start, I would like to have some trick to uncover the bottleneck...

카테고리

도움말 센터File Exchange에서 Startup and Shutdown에 대해 자세히 알아보기