How to remove this error: Input two of Voltage Measurement block Three-Phase V-I Measurement' is not properly connected to the network.

댓글 수: 5

Bruce Davis
Bruce Davis 2014년 7월 16일
If your Voltage Measurement Block is connected correctly, check your reference. If the reference input to the block is ground and there is no ground in your system, this will cause problems.
kamlendra rathore
kamlendra rathore 2016년 5월 3일
please change your configuration of 3 phase load to Y ground or to say the load 3 phase which you are using must have ground connection.
Mahdi Zolfaghari
Mahdi Zolfaghari 2017년 3월 16일
thank you!
MD SAIF MALIK
MD SAIF MALIK 2019년 11월 30일
can you please ellaborate sir, how you remove this error
Uttam Reddy Pailla
Uttam Reddy Pailla 2021년 6월 18일
Please let me know. Even i am facing the same issue

댓글을 달려면 로그인하십시오.

 채택된 답변

dpb
dpb 2013년 7월 24일

0 개 추천

Make the proper connection...
No can help w/o any other info--the message says the 2nd of the three inputs isn't actually connected to anything so the problem is upstream from there.

추가 답변 (5개)

ARPAN MALKHANDI
ARPAN MALKHANDI 2018년 1월 10일

1 개 추천

Provide proper grounding of the source and the loads
lal mohammed
lal mohammed 2015년 4월 28일

0 개 추천

i have a same problem with upfc ..can any 1 help me with this project!!
srinath r
srinath r 2016년 3월 30일

0 개 추천

Voltage Measurement
if true
% code
end
amogha
amogha 2016년 6월 23일

0 개 추천

Connect the load and ground it.
Nida Riaz
Nida Riaz 2017년 3월 16일

0 개 추천

Hello; What is the main difference between UPFC (Phasor Model) and UPFC (Detailed Model)? Please Guide Me. Thank You