Info
이 질문은 마감되었습니다. 편집하거나 답변을 올리려면 질문을 다시 여십시오.
PV Plant Simulation (100KW)
조회 수: 1 (최근 30일)
이전 댓글 표시
Hi Guys,
There is a model of 400 KW PV plant in simulink. I want to increase PV plant capacity by 2 times(800 KW) , 3 times(1200 KW) and so on. is there any way i can change to plant capacity without changing the parameters by using multiplication, addition etc. I can not connect same plant on parallel because i want to keep increasing plant size upto 30 MW. Please help me guys.
Thank you in advance
댓글 수: 11
답변 (0개)
이 질문은 마감되었습니다.
참고 항목
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!