Community Profile

photo

Tarek Zaqout


Last seen: 대략 1년 전 2019년부터 활동

Followers: 0   Following: 0

통계

  • Thankful Level 1

배지 보기

Feeds

보기 기준

질문


forecast future output of a defined model
Hi, I'm have input-output data and I'm using an armax model to forecast the production in the future. The time-series is for 5...

4년 초과 전 | 답변 수: 0 | 1

0

답변

질문


creating a loop and functions
Hi, I'm trying to perform a simple model but can't seem to create a loop. The issue is that I use known values (ho and hl) to...

4년 초과 전 | 답변 수: 0 | 0

0

답변

질문


Index exceeds number of array elements (181)
Hi, I have this error while I'm using this code. I can't seem to find the source of the error. for i=11:length(Tjord) ...

거의 5년 전 | 답변 수: 1 | 0

1

답변

질문


Plotting dates as text in the x-axis
Hi, I have a timeseries in the form of '23-Feb-2019 05:00:00' and I would like to plot it them as text in the x-axis. The probl...

거의 5년 전 | 답변 수: 1 | 0

1

답변

질문


How to find and plot the centroid of a curve I plotted
How can I plot the centroid of two curves I plotted from x=time series and y=flow rate data for both of the curves.

대략 5년 전 | 답변 수: 1 | 0

1

답변

질문


Converting time format from hh mm ss to minutes or seconds
I imported a time series in the format of HH:MM:SS from excel to matlab but it appeared as 0.4532343954 or something. How can I ...

대략 5년 전 | 답변 수: 1 | 0

1

답변