Power load cycle using GUIDE MATLAB GUI
The daily load curve of a utility is a composite of demands made by various classes of users.The greatest value of load during a 24-hr period called the peak or the maximum demand.Load factor is a ratio of average load over a designated period of time to the peak load ocuuring in that time.[Haddi Saddat Power System analysis P8].
We used barcycle function to plot the load cycles. Brcycle.m function is also included with the other files