I am currently modeling a manufacturing system using SimEvents that utilises the concept of transfer batching (part of an order moves to the subsequent work station before the order is finished in the current work station). I have currently modeled my entities in the system as orders and the order quantity as an attribute. Additionally, the processing time on the server is dependent on the order quantity. What I would like to know is whether it is possible to start the production of the same entity on the subsequent work station while it is not completed on the previous? Right now the order is only transmitted to the subsequent work station when it has completed full service.
댓글 수: 2
RenatoL
2020년 10월 16일
I don't understand the concept of transfer batching, but from my experience with SimEvents, perhaps what you can do is to add another attribute that contains the percentage of completion of the order, so say the value is in the range of 0-100.
Would that be useful for you?
채택된 답변
Abdolkarim Mohammadi
2020년 10월 17일
편집: Abdolkarim Mohammadi
2020년 10월 17일
You should use an Entity replicator block, which replicates entities based on the order size. Replicas are production batches after batching, which has batch sizes equal to 10 in your example. I have attached a simple model for you to investigate the details. The only point is where the batch size is not an integer multiplier of the order size, which you should specially consider in the attached model.
추가 답변 (0개)
참고 항목
카테고리
Help Center 및 File Exchange에서 Discrete-Event Simulation에 대해 자세히 알아보기
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!